Weekender pg3
This is our Weekender Trailer. Page 3

More construction photos

End view with Air conditioner cut out. I installed 2×3 s for support of the roof and ceiling. Now for the painting of the floor and interior. The floor is painted to seal it against water that might seep into the interior and get past the vinyl flooring.


The windows are installed and more paint is applied

The flooring is peel-stick-vinyl sheeting. The interior is large enough to accommodate a queen size foam mattress and sleeps the three of us. I hope you can see the value of waiting until the end of construction to add the end panels. It really helps when finishing the interior. The electrical is ready for installation. All wires are enclosed in snap together conduits for easy access.

Installation of the TV / Satellite Cables. End view before final exterior paint is applied. All knot holes and imperfections are filled with wood filler and sanded. All exterior joints are caulked and sealed. In addition I found some gutter/roof sealant with asphalt - butyl rubber with aluminum backing which I used in addition to the flashing along the exterior edges and wheel wells.